Answer:
$21,950
Explanation:
Factory overhead is fixed cost, which is not dependent on level of production volume while direct labour cost moves with the level of product unit manufactured during a period. Althought actual direct labor cost is lower than forecasted one, predetermined factory overhead for February should be same as actual amount, which is $21,950.